Sunday, August 2, 2009

Continue the work...shower











Tom has put a lot of work into the shower lately, doing the grout, been a little bit "grouty" doing it also. The show has taken a lot of time and work, Tom did the bottom 'pan' and the guys put the cement board on. I worked on the walls of the shower for 2-3 days, Tom did some and Jim Early finshed the top, and floor after Tom had his little heart attack. But we are at the end of it, Tom it attaching the plumbing fixtures now. Shower is a walk in, all slate, 6 x 6 feet with 2 shower heads. (one for Tom and one for me, can use both at the same time)